Bruner Project
Project Noble Data Center
MEP Engineer: H.F. Lenz
Construction Manager: Holder Construction
Project Size: 114,000 sq. ft.
Completion Date: June 2012
Bruner completed mechanical and plumbing systems for this new 114,000 sq ft, tier 4 data center. Extensive pre-planning and pre-fabrication was used to allow Bruner to complete the installation of all major piping systems between the months of July and December. Installation included: (4) 500 Ton Chillers, (2) 150 Ton Chillers, (4) Heat Exchangers, (14) Primary & Secondary Split Case Chilled Water Pumps, (6) Vertical Turbine Pumps, (2) 77,000 Gallon CHW Storage Tanks, a full fuel oil system including (4) 25,000 Gallon Underground Storage Tanks, a 300 ft long Insulated Metal Plenum complete with (14) Cooling coils and (28) fans for server floor cooling, a Water Cooled Mainframe System, and (5) Heat Pump AHUs.