Project included the installation of
3 centrifugal chillers and cooling towers and pumps for
this critical Bank One Data Center. Extensive estimating
and engineering was needed to develop a plan to install
and commission the mechanical systems while the Data Center
remained in operation. Detailed scheduling, preplanning,
pipe fabrication and strong attention to quality control
was key to the success of the entire project.