back
Riverside Methodist Hospital
The Heart E/D project is Ohio Health’s
latest addition to Riverside Hospital. The 214,000 square
foot facility is the new home of the Hospitals Emergency
Department and Cardiac Care Facility. A separate Medical
Office Building totaling 82,000 square feet tops this
facility. Bruner’s activities on the Heart E/D included
all the HVAC work including sheet metal, hot water, steam
and chilled water systems. We also installed all the domestic
plumbing, storm drainage piping, and the piping for the
medical gases. Activity on the Medical Office Building
included providing the primary HVAC equipment and basic
plumbing installation to be followed by subsequent tenant
build out. Project was completed in May 2005. |