The Challenge:
Replace a 1200 ton chilled water cooling system in AEP’s occupied 26 story office building in Fort Wayne, Indiana.
The Solution:
Bruner Corporation was able to stage the replacement of the complete chiller plant, including pumping systems, piping and temperature controls while enabling AEP to continue normal daily business function, with no interruption to their chilled water service. The project was completed as a turn key project for AEP by Bruner including commissioning, demolition, recycling, structural systems, general trades, electrical systems, and temperature controls. The new plant features a variable primary chilled water pumping system supplied by two 500 ton high efficiency water cooled chillers and one 200 ton high efficiency air cooled chiller that is connected to the buildings emergency power system. All facets of the project were completed with intentions of gaining USGBC LEED-EB certification.
The Result:
Project was completed on time, under budget and with zero
punch-list items.
Submit a Service Request »
|